Risk assessment data directory – Construction risk for offshore units

£0.00

IOGP Report 434-18

Analyse estimates of fabrication, construction and installation risks in respect of asset damage/loss and personnel safety

IOGP Members can also access all publications via the library in the Members Area

SKU: 434-18 Category: Tag:

Description

IOGP Report 434-18

Analyse estimates of fabrication, construction and installation risks in respect of asset damage/loss and personnel safety

This datasheet presents estimates of fabrication, construction and installation risks in respect of asset damage/loss and personnel safety. The data are mainly applicable to offshore installations although reference is made to onshore construction fatal accident rates. The datasheet has not been designed to assist with the quantification of general project management uncertainties for the purpose of estimating the likelihood of project schedule and cost overruns. This is considered to be a separate subject. Measured in terms of the life-cycle of a project, the fabrication, construction and installation phases have a short duration and can be characterised as: • labour intensive, • involving a large number of one-off tasks, • requiring temporary work arrangements and working environments, • exposing components/structures to non-design loading condition.

Additional information

Topic

Risk assessment

Document type
Publication Date

2010